Home › Guides › Renovation, GC & carpentry › Kitchen remodel guide: planning, layout, cost drivers and timeline
GuideThe kitchen is the most popular — and most valuable — room to remodel, but it's also where budgets and timelines blow up fastest without a plan. Whether you're refreshing cabinets or gutting to the studs, understanding the layout, the cost drivers and the process keeps your project on track. Here's the complete planning guide.
Kitchen projects fall on a spectrum. A refresh (paint or reface cabinets, new hardware, fixtures, backsplash) transforms the look for far less. A pull-and-replace keeps the layout but swaps cabinets, counters and appliances. A full remodel changes the layout, which means moving plumbing, electrical and sometimes walls — the most expensive but most transformative. Deciding your scope first drives everything else.
Good kitchen function comes from the relationship between the sink, stove and fridge — the classic 'work triangle' — with enough counter space between them. Before changing a layout, think about how you actually cook and move. Moving the sink or stove means relocating plumbing and gas/electrical, which adds significant cost, so keeping the existing layout saves money if it already works.
The big cost drivers are cabinets (usually the single largest line), countertops (material matters enormously), appliances, and whether you're moving plumbing or electrical. Layout changes, structural work and high-end finishes push costs up fast. Labour for skilled trades — plumbing, electrical, tiling, cabinetry — is a major component. Itemized quotes let you see exactly where the money goes.

Save by keeping the existing layout, refacing rather than replacing solid cabinets, choosing durable mid-range counters, and mixing a statement feature with budget-friendly surroundings. Splurge where you touch and use daily — good cabinet hardware, a quality faucet, durable counters — and on anything hard to change later. Don't over-personalize if resale matters.
A full kitchen remodel typically runs several weeks to a couple of months once work starts, plus design and ordering lead time beforehand (cabinets and custom items have long lead times — order early). Build in buffer for the surprises behind walls and inspection scheduling. Living without a kitchen is disruptive, so plan a temporary setup.
Kitchen remodels often involve plumbing, electrical and sometimes structural work that needs permits and licensed trades — this protects you and matters at resale. Get itemized quotes from vetted pros, a written scope and payment schedule tied to milestones, and a clear process for approving any extra work before it's done.
Describe your scope and share photos and measurements to get firm, comparable quotes. On Genie you post your kitchen project once and receive multiple itemized quotes from verified, insured pros, compare profiles and past kitchens alongside price, and keep the whole project — scope, quotes and warranty-backed work — in one place.
Every task in this guide is something you can book on Genie — vetted, insured pros at an upfront or quoted price:
It varies widely with scope — a refresh (paint/reface, hardware, backsplash) is a fraction of a full remodel that moves plumbing and electrical. Cabinets and countertops are usually the biggest line items. Itemized quotes show exactly where the money goes.
Cabinets (often the largest line), countertops, appliances, and moving plumbing or electrical for a layout change. Keeping the existing layout and refacing solid cabinets are the biggest money-savers.
Typically several weeks to a couple of months once work begins, plus design and ordering lead time beforehand — cabinets and custom items have long lead times, so order early and build in buffer.